Our Story



NATURE OF BUSSINESS

      IMPORTERS & SUPPLIERS

i.        Importers of Agarwood seeds
Importing seeds Aquilaria Crassna species from Thailand.
No. Permit Import                   :- JPK14XXXXXXXXX
Phytosanitary Certificate        :- 16XXXXXX
Certificate of Origin               :- 16XXXXXX (based on Phytosanitary Certificate)


ii.      Agarwood Supplier for Seedlings
Supplying Agarwood Seedlings for spesis:-
a)      Aquilaria Malacensis – year 2007-2011 supplied 20,000 seedlings
b)      Aquilaria Crassna – year 2007-2011 supplied 54,000 seedlings
c)     Aquilaria Hirta – company plantation 40 trees (to produce seedlings)
















 
















iii.    Supplier of Agarwood Fertilizer & Others Fertilizer
Supplier/producer of special fertilizer for Aquilaria Tree. Fertilizer formula is based on the need of the tree depending on stages of growth .

a)      Baja Penanaman Gaharu G-Max
This fertilizer is needed by the seedling after two months planting up to one year. The contain of this fertilizer will supply adequate nutrients to strengthen the roots & stems of Agarwood tree.

b)     Baja Pembesaran G-Max
This fertilizer will be applied after one year two month up to three years ten months. This particular fertilizers will supply enough nutrients to the tree for faster growing and  strengthen the trunk of Agarwood tree.

c)      Baja Resin G-Max
This fertilizers will applied two months before the treatment process (inducement / inokulation). It will supply adequate nutrients for the stem to form an oily wood and encouraging tree resin production.


    PLANTING & FARMING

i.        The Company cultivation records
The Company Agarwoods Plantation:-

a)      Company Plantation in Bukit Sentosa, Selangor
Planted on 20 August 2007. Land owned by Mr Mohammad Ikram Bin Ismail - 3 acres with a volume of  more than 2,000 Agarwood trees + mix crops of fruit tree.

b)     Private Planting Rasa, Selangor
Planted on 25 October 2007. Land owned by Mr Mohammad Ikram Bin Ismail, 5 acres with a volume of more than 2,000 Agarwood trees. ( Planting process is in progress – stage by stage )

c)      Private Planting Hulu Rening, Selangor
Planted on 25 August 2008. Land owned by Mr Ismail Bin Kassan, 3 acres with a volume of 3,000 plants trees only.


    Join Venture Plantation
This joint venture is in between the  company and the land owner. Land owner provide the land, the manpower for  fertilizing jobs, clearing the area and the safety of the tree. On the other side the company must prepare the seedling, barbed wire fencing, netting fence, fertilizers, and bear all costs of treatment. The revenue share is 30% belong to the land owner and 70% company. Below are the JV plantation records:-

a)      Join Venture Plantation Gedangsa Phase 1
i)     Planted on 16 January 2010. Land owned by Hj. Mustafa B. Hussain, an area of 1 acre with tree volume of 1,000 tree stand per acre. Plantation Spacing was 4 feet x 4 feet.

b)     Join Venture Plantation Gedangsa Phase 2
i)   Planted on 25 April 2010. Land owned by Mrs. Siti Asmah Bt. Mohd. Shukor, an area of 1 acre with tree stand of 900 tree stand per acre. Plantation Spacing was 4 feet x 4 feet.

ii)    Planted on 25 April 2010. Land owned by Hj. Mohamed B. Mohd Jonit, an area of 1 acre with tree stand of 750 tree stand per acre. Plantation Spacing was 4 feet x 4 feet.

iii)  Planted on 25 April 2010. Land owned by Mr. Taha Aspani B. Ab Kader, an area of ​​1 acre with tree stand of 550 tree stand per acre. Plantation Spacing was 4 feet x 4 feet.



c)      Join Venture Plantation Teroi Bukit Phase 1
i)        Planted on May 22, 2010. Land owned by Mr. Yusof B. Abdul Kadir, an area of 3 acres with trees quantities of 1,500 tree stand per acre. Plantation Spacing was 4 feet x 4 feet.

d)     Join Venture Plantation Sg. Tengi Phase 1
i)        Planted on 22 June 2010. Land owned by Mr. Ali B. Hussain, an area of 1 acre with tree stand of 500 trees per acre. Plantation Spacing was 4 feet x 4 feet.

ii)    Planted on 22 June 2010. Land owned by Mrs. Aminah Bt. Asmadi, an area of 1 acre with tree stand of 500 trees per acre. Plantation Spacing was 4 feet x 4 feet.

e)      Join Venture Plantation Gadik Phase 1
i)        Planted 28 May 2010. Land owned by Mr. Md. Tan B. Abd Rahim, an area of ​​1 acre with tree stand of 1,000 trees per acre. Plantation Spacing was 4 feet x 4 feet.

f)       Join Venture Plantation Gedangsa Phase 3
i)        Planted on 20 March 2011. On land owned by Mr. Samsudin B. Mohamed, an area of 1 acre with tree stand of 500 trees per acre. Plantation Spacing was 4 feet x 4 feet.

g)      Join Venture Plantation Sg. Tengi Phase 2
i)    Planted on 5 May 2011. Land owned by Mr. Mohamed B. Atak, an area of 1 acre with tree stand of 1,000 trees per acre. Plantation Spacing was 4 feet x 4 feet.

ii)   Planted on 5 May 2011. Land owned by Mrs. Asmah Bt. Mat Rawi, an area of 1 acre with tree stand of 500 trees per acre. Plantation Spacing was 4 feet x 4 feet.

h)     Join Venture Plantation Gedangsa Phase 4
i)  Planted on 10 September 2011. Land owned by Mrs. Fatima Bt. Abd Radzak, an area of 1 acre with tree stand of 500 trees per acre. Plantation Spacing was 4 feet x 4 feet.

i)        Join Venture Plantation Gedangsa Phase 5
i)    Planted on October 17, 2011. Land owned by Mr. Nawawi B. Md Taib, an area of ​​1 acre with tree stand of 1,500 trees per acre. plantation Spacing was 4 feet x 4 feet.